IMG-7314.jpeg

Tiltex B Anti Cracking GCCM benefits

replaces

rip rap. concrete. shotcrete. grout blankets. bitumenous membranes. stone. rock pitching.

icons-01.png

5 METRE WIDE ROLLS - can be customised

less seams

FAST THERMAL WELDING PROCESS

NO SCREWS REQUIRED WITH SEAMS

reduced material wastage

Shorter construction schedule.

3000m2 + per day installation rate per 4 person crew*

 
 
icons-02.png
 

independently tested, fire resistant & freeze/thaw capacity tested to -50C

Tiltex B will endure significant freeze and thaw cycles that often damage concrete.

 
icons-06.png
 

ANTI CRACKING FORMULATION

COMPRESSIVE STRENGTH OF 80MPa

HIGH FLEXURAL STRENGTH OF 16.1*** MPA


*subject to access and difficulty factor

**subject to application

***tested after 7 days


 
 
 
icons-03.png
 

sustainable solution to traditional erosion control systems

LESS MATERIALS IN PRODUCTION & INSTALLATION*

less transportation required therefore less carbon emissions

*80% reduction in concrete used in recent State Rail project

 
 
icons-04.png

durability & survivability

50 year design life

30 year manufacturer’s warranty**

 
icons-05.png
 

Tiltex installation complies with safe work methods.